Copyright - All Rights Reserved - The Padraig Smith Partnership Ltd
Indicative Case Study
The subject dwelling,
approx. 1,600 sq ft, is a single
storey bungalow with traditional detailing. It has a low-profile section
including a series of shallow pitch roofs, the roof structure is at a height
of 5.5m to the ridge above finished floor level. The
elevations of the dwelling will be predominantly finished using a simple
palette of materials and nap render finish.
The estimated Building Energy Rating (BER) based upon an assumed specification - Med/High B, this rating can be improved by increasing the specification thus altering overall build cost.
Build
Cost Analysis
Estimated
Cost using the traditional main contractor route:-
€275,200
Total
Cost of Construction using PSP-MB&E:-
€217,600
(Price based upon same specification & including PSP-MB&E Professional Fee)
Potential cost saving by appointing PSP-MB&E:- €57,600
(Main
contractor prices based upon typical rates as calculated from a selected
number of tender prices received for similar scaled projects – 2009)
The
stated figures are for indicated purposes only and are subject to revision
based upon specification, construction method, etc. Please note that the below
that the aforementioned costings are inclusive of the relevant vat rates.
Prices exclude the procurement of site and associated planning costs / contributions etc.